TERMINAL CONFIGURATION & DESIGN SPECIFICATIONS
| LNG Storage Capacity |
4 - 180,000 cubic meters (m3) full-containment storage tanks. |
| Regasification Capacity |
2.0 Billion Cubic Feet (bcf) per day. |
| Pipeline Interconnection |
Offshore, subsea natural gas pipeline, connects to interstate pipeline grid. |
| Power Facilities |
Island power supply fueled by clean, natural gas engines. Waste heat from power facilities used in the LNG process. |
| Marine Facilities |
Two protected docking and unloading facilities for LNG tankers
with capacities of 70,000 to more than 250,000 m3.
Additional small craft docking for safety and supply vessels. |
| Vaporization Facilities |
Ambient air vaporization equipment to convert LNG into natural gas without using seawater. |
Other Facilities |
Self-contained fire, security and communication facility
in accordance to U.S Coast Guard regulations.
|
|